Tech / TopJuicer
Prepare your space for TopJuicer with Scanomat’s pre-installation guide. From equipment dimensions to utility connections, it brings together the planning details for your TopJuicer and water cooler before work begins.
Scanomat · Version 2.0 · 2020
What’s covered
- Planning
- Equipment dimensions and cabinet layouts for the TopJuicer and water cooler, including standard and behind-the-wall installation examples.
- Cut-outs
- Cabinet ventilation and countertop preparation for the faucet, drip tray, pushbuttons, and iPad mounting options.
- Electricity
- Power requirements and outlet positioning, with a plug point for each unit and specifications for the U.S. and Canada.
- Plumbing
- Water supply, filtration, and drainage requirements, with an adjacent-cabinet layout and optional CO2 bottle placement.
Questions about your layout? Contact Touchless Coffee before finalizing your installation plans.

